欢迎进Allbet欧博官网,Allbet欧博官网是欧博集团的官方网站。Allbet欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

首页体育正文

免费足球推荐(www.ad168.vip):Fukushima debris removal delayed by another year

admin2022-08-286

皇冠开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠开户的平台。皇冠开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

免费足球推荐www.ad168.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论

最新评论